>Announcement of Dedicated Passenger Corridors
>rolling out of kavach - 4/5 years substantial infra - standard - designed for 180kmph
>kavach 5.0 - designed for 280kmph - eventually will become the standard for DPCs
>DPCs - will be designed for 350kmph, 320kmph operating speed.
>Vision - 17,000km by 2047 - our own signaling, etc.
>Vande Bharat - 3.0 is current one.
>Reimagine - VB 4.0
- toilets / seats / quality improvement of the vande bharat - next 18 months - push for exports
>Amrit Bharat trainsets
- current 2.0
- future 3.0 - push/pull for longer distance
- 4.0 - new gen coaches and locomotives cells (36 months goal)
>Infrastructure
- track manufacturing process improvement - quality improvement
- openly warning industrial groups that QC needs to improve or face wrath
- expect 10x improvement in signalling, track quality, components in locomotives etc.
>New technologies
- Hydrogen powered trainsets
- we focused to have indigenous solution - design and development
- most powerful hydrogen train
- employee education improvements - GSV participation (Gati Shakti Vidyalaya).
- we should design instead of running after tot - in every sector not just railway (36 months goal)
- reports every two months
>Door to Door logistic solutions
- next set of steps
- complete logistic solution provider
- Next 12 months
>Improvements in bridge and tunnel designing stuff and knowledge base prep
- get best people from anywhere to get this capability
https://www.youtube.com/watch?v=K2aJMQ0tu2E[embed] Ashwini ji dropping whitepills.
Goal of 17,000km of HSR via Dedicated Passenger Corridor in next 22 years. Almost close to 700km of hsr lines every year. If he achieves this then he will go down as the greatest railway minister ever. He already is our best IR minister. Visionary bar none.
Anonymous
loc-IN
>Announcement of Dedicated Passenger Corridors
>rolling out of kavach - 4/5 years substantial infra - standard - designed for 180kmph
>kavach 5.0 - designed for 280kmph - eventually will become the standard for DPCs
>DPCs - will be designed for 350kmph, 320kmph operating speed.
>Vision - 17,000km by 2047 - our own signaling, etc.
>Vande Bharat - 3.0 is current one.
>Reimagine - VB 4.0
- toilets / seats / quality improvement of the vande bharat - next 18 months - push for exports
>Amrit Bharat trainsets
- current 2.0
- future 3.0 - push/pull for longer distance
- 4.0 - new gen coaches and locomotives cells (36 months goal)
>Infrastructure
- track manufacturing process improvement - quality improvement
- openly warning industrial groups that QC needs to improve or face wrath
- expect 10x improvement in signalling, track quality, components in locomotives etc.
>New technologies
- Hydrogen powered trainsets
- we focused to have indigenous solution - design and development
- most powerful hydrogen train
- employee education improvements - GSV participation (Gati Shakti Vidyalaya).
- we should design instead of running after tot - in every sector not just railway (36 months goal)
- reports every two months
>Door to Door logistic solutions
- next set of steps
- complete logistic solution provider
- Next 12 months
>Improvements in bridge and tunnel designing stuff and knowledge base prep
- get best people from anywhere to get this capability
https://www.youtube.com/watch?v=K2aJMQ0tu2E Ashwini ji dropping whitepills.
Goal of 17,000km of HSR via Dedicated Passenger Corridor in next 22 years. Almost close to 700km of hsr lines every year. If he achieves this then he will go down as the greatest railway minister ever. He already is our best IR minister. Visionary bar none.